The new requirements are:
In order to reduce cost whilst maintaining performance and security at both the Watford and Stevenage sites, the following changes will be introduced to the design:
o Only one router will be required at each site. Extensive use will be made of VLANs, trunking between switches and inter-VLAN routing.
o Trunk links between intermediary devices should use gigabit interfaces to maximise available bandwidth. Only the VLANs specifically required on each site should be allowed to traverse the trunk links.
o All PCs in each site should obtain their full IP addressing information using DHCP configured on the respective sites router. On each subnet the last five IP addresses should not be allocated by DHCP.
o The IP addressing scheme should remain the same as in assignment 1.
o All PCs at the Watford site should be able to browse to the two web servers located in the server
In order to reduce cost whilst maintaining performance and security at both the Watford and Stevenage sites, the following changes will be introduced to the design:
o Only one router will be required at each site. Extensive use will be made of VLANs, trunking between switches and inter-VLAN routing.
o Trunk links between intermediary devices should use gigabit interfaces to maximise available bandwidth. Only the VLANs specifically required on each site should be allowed to traverse the trunk links.
o All PCs in each site should obtain their full IP addressing information using DHCP configured on the respective sites router. On each subnet the last five IP addresses should not be allocated by DHCP.
o The IP addressing scheme should remain the same as in assignment 1.
o All PCs at the Watford site should be able to browse to the two web servers located in the server