+1(316)4441378

+44-141-628-6690

Gantt Chart

Assignment is four parts. Please label each part of the assignment Part 1, Part 2, Part 3, and Part 4 in the document, and insert a page break after each part. Please submit as one document.

Assignment requires the use of MS Project or similar software.

Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure. Please refer to the Integrated Project. Include:

1. An activity precedence diagram 2. An activity duration table 3. A network diagram and Gantt charts

Part 2: Please complete Case Study 10.2, “Project Scheduling at Blanque Check Construction” respond to the questions for discussion. Please make sure that each question is answered thoroughly; minimum of 200 words for each case study question.

Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document.

1. Draw the activity network as a Gantt chart. 2. What is the expected duration of the project?

Part 4: Consider the project with the information provided in the Project Activity Network document.

1. Construct the project activity network using AON methodology and label each node. 2. Identify the critical path and other paths through the network.

 

You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.

 

Latest completed orders:

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min
[order_calculator]