https://www.youtube.com/watch?v=aiWgkHz2EBQ
watching this video and answer those two question
1.Charles Waldheim positions the field of landscape architecture to take over projects which have historically been occupied by "planning mechanisms". Similarly in an earlier semester Pierre Belanger positions the field of landscape architecture to take over projects which have historically been occupied by "Civil Engineers". Knowing Charles interest in Landscape Urbanism and Pierre's interest in Infrastructure what are the overlaps between the repositioning of Landscape Architecture?
2.If we acknowledge ecology equals the relationship between species and their environment what does a phased system or design allow for?
Order Description
Interim Assessment. Document of Case Based Precedence about Reinforced concrete Frame. 5 Case Study should be relevant to the project which is construction of six storey, two floors of RC Frame car park and the other floors is steel frame. my part focus in the 2 floors of RC frame car park, develop a study, analysis and review on why I choose a typical mixture of RC that have been used in the case study and it has been successful, buildings that used slabs concrete in their car park structure. Analysis the slabs (dimension, width, depth, thickness,..) same goes to the columns, beams..., trying to make the spice less column to fit more cars as possible.
1-must be in-situ reinforced concrete and the management of shell and core.
2- including calculations
3- mention the health and safety.
4- most important thing for the client is the time then cost the quality
inclding some picture(need the source beside it), should mention the time o
Interim Assessment. Document of Case Based Precedence about Reinforced concrete Frame. 5 Case Study should be relevant to the project which is construction of six storey, two floors of RC Frame car park and the other floors is steel frame. my part focus in the 2 floors of RC frame car park, develop a study, analysis and review on why I choose a typical mixture of RC that have been used in the case study and it has been successful, buildings that used slabs concrete in their car park structure. Analysis the slabs (dimension, width, depth, thickness,..) same goes to the columns, beams..., trying to make the spice less column to fit more cars as possible.
1-must be in-situ reinforced concrete and the management of shell and core.
2- including calculations
3- mention the health and safety.
4- most important thing for the client is the time then cost the quality
inclding some picture(need the source beside it), should mention the time of every process, like how long they toke to finish cons
Interim Assessment. Document of Case Based Precedence about Reinforced concrete Frame. 5 Case Study should be relevant to the project which is construction of six storey, two floors of RC Frame car park and the other floors is steel frame. my part focus in the 2 floors of RC frame car park, develop a study, analysis and review on why I choose a typical mixture of RC that have been used in the case study and it has been successful, buildings that used slabs concrete in their car park structure. Analysis the slabs (dimension, width, depth, thickness,..) same goes to the columns, beams..., trying to make the spice less column to fit more cars as possible.
1-must be in-situ reinforced concrete and the management of shell and core.
2- including calculations
3- mention the health and safety.
4- most important thing for the client is the time then cost the quality
inclding some picture(need the source beside it), should mention the time of every process, like how long they toke to finish cons