+1(316)4441378

+44-141-628-6690

Need Response to below discussion

 

Phase 1: Identify and diagnose the problemRecognizing problems as opportunities 

I ‘m Network engineer working for a manufacturing plant. Our organization manufactures Al coils  and on average production of 50,000 tons.  In order to perform the tasks, operator needs to run applications for tracking the stages of its production and document for faster, reliable and accurate results.

We have identified the problem to be Wi-fi Issue. The reasons for  weak signals and packet drop/loss inside the plant are material absorption, signal reflection from the walls. 

Phase 2: Generate Alternative SolutionsReady made & Custom made not best one

The possible solutions are increasing signal strength by having high gain and low loss omni directional antenna rather than directional antenna. In general, Organizations try to boost the signal strength by increasing the Access points & antennas . This can be considered as ready made solution available in the

market. When we considered this case, increases the cost of hardware inventory all over the plant . This is not effective solution even though we might reduce the signal loss.

phase 3: Evaluating Alternatives – out of all options which are best  for great profit . Source : 

Second possible alternative,  we can come up is  wired connectivity rather than the wireless technology. but, in our scenario the operator needs to be moving to  different locations in the crane.  There are various steps that are involved for transferring the coil, such as  slab to coil conversion which is hot  needs to cooled

and next need to be shipped and packaged as per the customer requirements . Thus, wired connectivity doesn’t seem to help my situation. 

Third alternative, we have identified is implementing the latest technology such as 5ghz that are much faster than 2.5ghz for stronger connectivity. But, they got its share of cons. As part of this project we have invested to work with Ekahau tool to reduce the cost by identifying the exact locations and type of antenna

including tilt,distance, angel also calculate the losses.Thus, this choice seems to be more reliable and advanced technically  out of all available options 

phase 4: Making the choice: consider multiple scenarios raises what if questions for decision makers and highlights the need for contingency plan.  

Out of all available options, it took lot of research includes time, energy and money. We have accepted the combination of  5ghz technology combined with tool that satisfy reaching the goal in optimizing way. 

phase 5: Implementing the decision: Be prepared that things will not be as expected as the circumstances are not the same.  Source : (Bateman, Snell, & Konopaske, 2019, p. 80)

In this stage, we have implemented the plant wide graph and added all the wireless devices, antennas, walls . Thus, we got the output for the best quality signal coverage all over the plant . This is helpful as we are not making any changes in the production environment.

but, tool gives almost same output when implemented in your live network that reduces the cost, time and human power.

phase 6: Evaluating the decision: Consider the feed back and try all 6 steps again in case of not expected outcome . 

After implementing the changes applied in tool and 5GHZ we could see there is reliable connectivity of wifi all over the plant. The only downside we found was the 5GHZ is also being used by AGVS which causes the interferences. The possible solution is to move to different channels than the existing one to have smooth

no signal loss.This was not expected but, we could say that we have reached our goal and are in better position than previously. We consider this to be successful as, all the 6 phases have been executed  and best decision in our plant network with the available conditions.

 

You can place an order similar to this with us. You are assured of an authentic custom paper delivered within the given deadline besides our 24/7 customer support all through.

 

Latest completed orders:

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min
[order_calculator]